Move Photos
Egloff 2 2014-06-02_flatworkRemoved   2014-06-05_tempElectricInstalled  
At the beginning Driveway/sidewalk removed Temporary electric installed
2014-06-11_firstBeamHoleCut   2014-07-22_holes-fence   2014-08-11_am  
First beam hole cut Beam holes and fencing Beam holes under garage section
2014-08-22_measuringFoundationCutLine   2014-08-25_am-cCuttingUnder   2014-09-10_2  
Measuring foundation cut line Cutting under front section Beams in place under front section
2014-09-15   2014-09-24_attachingSawSouthWall   2014-09-24_markingEastWall  
Waiting for rain to stop Cutting south wall of house Marking vertical cut line east side
2014-09-24_markingHouse   2014-09-24_sawEastWall1   2014-09-24_sawEastWall2  
Vertical cut on west side Vertical cut on east side Going up
2014-09-24_sawEastWall5   2014-09-29_interiorGarageCut   2014-09-30_cuttingCeilingAboveGarage  
At the top Vertical cut inside garage Ceiling cut in garage w/cribbing support
2014-09-30_interiorBedroomSaw4   2014-09-30_interiorBedroomSaw6   2014-09-30_interiorRecRoomSaw  
Separating front bedroom Front bedroom interior vertical cut Vertical cut in family room
2014-09-30_interiorRecRoomSaw2   2014-10-06_RecRoomSupportWallFromHallway   2014-10-01_kitchenWallSaw1  
Family room floor cut Family room support wall / top of stairs Vertical cut in kitchen
 2014-10-02_BedroomSupportWall  2014-10-06_framingGarageSupportWall 2014-10-07_garage door framed2   
Support wall in upstairs bedroom Support wall in garage Garage door supports
2014-10-08_porchColumnCribbing1     2014-10-08_prepForLift 2014-10-08_garageUpJacksCribbing
Cribbing added to support front column Clearing ground for cribbing Jacks in place and lifting
  2014-10-08_garageUpEast1 2014-10-08_garageUpEast2    2014-10-08_garageUpWest  
Front section going up - east side Ever so slowly - east side West side going up
2014-10-08_garageUpWest2   2014-10-08_garageUpEastCaught3   2014-10-08_Just the flange  
West side base Front section catches back section Just caught the edge flange
 2014-10-09_garageUp3rdLift2 2014-10-09_garageUp3rdLift4   2014-10-08_garageUpWest6  
Third lift - west side Third lift - front Third lift - east side
2014-10-09_garageUp4thLift1   2014-10-09_garageUp4thLift10   2014-10-10_underGarage  
Fourth lift - west side Fourth lift - east side Under garage after final lift
2014-10-09_frontStepGone   2014-10-08_southWallSaw4   2014-10-08_southWall  
Front step removal Sawing beam holes in south wall South wall ready for support beams
2014-10-9_garageUp4thLliftFinal   2014-10-21_beamHolesByFrontDoor   2014-10-21_BeamHolesUnderFrontSection  
East side after final lift of front section Beam holes cut under front door Beam holes 2014-10-08_garageUpEastCaught3  
Egloff 2 2014-06-02_flatworkRemoved   2014-06-05_tempElectricInstalled  
At the beginning Driveway/sidewalk removed Temporary electric installed
2014-06-11_firstBeamHoleCut   2014-07-22_holes-fence   2014-08-11_am  
First beam hole cut Beam holes and fencing Beam holes under garage section
2014-08-22_measuringFoundationCutLine   2014-08-25_am-cCuttingUnder   2014-09-10_2  
Measuring foundation cut line Cutting under front section Beams in place under front section
2014-09-15   2014-09-24_attachingSawSouthWall   2014-09-24_markingEastWall  
Waiting for rain to stop Cutting south wall of house Marking vertical cut line east side
2014-09-24_markingHouse   2014-09-24_sawEastWall1   2014-09-24_sawEastWall2  
Vertical cut on west side Vertical cut on east side Going up
2014-09-24_sawEastWall5   2014-09-29_interiorGarageCut   2014-09-30_cuttingCeilingAboveGarage  
At the top Vertical cut inside garage Ceiling cut in garage w/cribbing support
2014-09-30_interiorBedroomSaw4   2014-09-30_interiorBedroomSaw6   2014-09-30_interiorRecRoomSaw  
Separating front bedroom Front bedroom interior vertical cut Vertical cut in family room
2014-09-30_interiorRecRoomSaw2   2014-10-06_RecRoomSupportWallFromHallway   2014-10-01_kitchenWallSaw1  
Family room floor cut Family room support wall / top of stairs Vertical cut in kitchen
 2014-10-02_BedroomSupportWall  2014-10-06_framingGarageSupportWall 2014-10-07_garage door framed2   
Support wall in upstairs bedroom Support wall in garage Garage door supports
2014-10-08_porchColumnCribbing1     2014-10-08_prepForLift 2014-10-08_garageUpJacksCribbing
Cribbing added to support front column Clearing ground for cribbing Jacks in place and lifting
  2014-10-08_garageUpEast1 2014-10-08_garageUpEast2    2014-10-08_garageUpWest  
Front section going up - east side Ever so slowly - east side West side going up
2014-10-08_garageUpWest  
Front section going up - east side Ever so slowly - east side West side going up
2014-10-08_Just the flange  
West side base Front section catches back section Just caught the edge flange
 2014-10-09_garageUp3rdLift2 2014-10-09_garageUp3rdLift4   2014-10-08_garageUpWest6  
Third lift - west side Third lift - front Third lift - east side
2014-10-09_garageUp4thLift1   2014-10-09_garageUp4thLift10   2014-10-10_underGarage  
Fourth lift - west side Fourth lift - east side Under garage after final lift
2014-10-09_frontStepGone   2014-10-08_southWallSaw4   2014-10-08_southWall  
Front step removal Sawing beam holes in south wall South wall ready for support beams
2014-10-9_garageUp4thLliftFinal   2014-10-21_beamHolesByFrontDoor   2014-10-21_BeamHolesUnderFrontSection  
East side after final lift of front section Beam holes cut under front door Beam holes under garage   
 2014-10-22_BeamHolesThruBasement 2014-10-22_SeveringBasementSteps   2014-10-17_staircaseBeamHole   
Beam holes through basement Severing staircase from foundation Exterior staircase beam hole
2014-10-28_frontReadyToRoll   2014-10-28_frontRolling1   2014-10-28_frontRolling3  
Ready to roll Rolling .... rolling ...
2014-10-28_frontRolling4   2014-10-29_fontOnStreet   2014-10-31_makingRoomForBack  
rolling ... Front section makes it to the street Making room for back section on street
 2014-10-31_readyToMove 2014-10-30_finalCutsBackSection 2014-10-30_sansGarage  
Front section ready to move Final cuts to back section Back section without garage
2014-11-3_readyForBeams   2014-11-18_backSectionUp   2014-11-18_backSectionUpSomeMore  
Sealed against weather & ready for beams Back section separated from foundation And into the air
2014-11-20_1   2014-11-20_rollerBeamPlaced-2   2014-11-25_backSectionForward-2  
Waiting for roller beams First roller beam in place Two pulls and off foundation
2014-11-25_backSectionForward-4   foundation
2014-11-25_backSectionForward-4   Leaving old foundation behind Prepping for next pull Almost there ....
off the lot   dolly loading2   dolly loading1    
Off the lot and waiting for spring move It's August, time to move Dollies being placed under front section
     
bolster unloading 1 bolster unloading 2 bolster unloading 3
First piece of bridge assembly arrives Off to the center of the bridge Center support on the bridge
 
       
       
       
      | , MO
      Contact Us  |  Site Map  
      City of Mason City
      10 First Street NW, Mason City, IA 50401    |    641-421-3600    |    Contact Us
      City Hall office hours are 8:00 a.m.-4:30 p.m. Monday-Friday. City Hall is closed on major holidays.
      Site Map    |    Disclaimer    |  Powered by MunicipalCMS
      E-notify RSS Feeds Twitter Facebook 
      0